Lettable standard
Lettable standard - post-void work
The table below shows the actions now undertaken once the new tenant has moved in.
| Element | Task |
| Windows | Replace any failed double-glazed units. |
| Doors - Internal | Renew if damaged beyond repair, considering the 50% rule. |
| Doors External | Carry out necessary repairs to doors including decoration where required. |
| Kitchens | Ensure cooker space has 600mm stainless steel splashback |
| Bathroom | 2 or 3 apartment ground floor properties to be changed to wet rooms at planned upgrade through capital programme. |
| Upgrades | Arrange mutually convenient date to undertake necessary upgrades. |
| Decoration | Minor decoration, issue a decoration voucher for sign up. |
| Attic space | Top up insulation if less than 300mm. |
| Attic space | Install walkway to tanks where required. |
| Attic space | If condensation is evident fit additional ventilation. |
| Garden | Cut back overgrown weeds, grass, hedges and leave in a manageable state for new tenant. |
| Misc | Remove redundant coal bunkers. |
| Sheds and outbuildings | Remove any with health and safety concerns. |
| Sheds and outbuildings | Inspect condition of shed or other ancillary building, repair, paint or replace as required, ensure those with locks are fully operational. |
| Fences and gates | Boundary fences and gates to be safe and secure. |